[OE-core] Yocto Project Status WW32

Jolley, Stephen K stephen.k.jolley at intel.com
Fri Aug 7 14:54:39 UTC 2015


Current Dev Position: 1.9 Milestone 3 (M3)

Next Deadline: M3 cut off of August 24th at noon GMT (on hold, see status)


SWAT team rotation: Juro -> Anibal

https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

*         1.9M2 is in QA, tests so far have shown some issues, only an lsb/shadow password issue may trigger an rc2 from the test results so far.

*         Richard is travelling atm. We have tried a build of various queued patches on the autobuilder with only around a 80% success rate of the patches which is disappointing. Some have been missing very basic testing. This means patch merging will slow down, now likely until after we decide if we run an M2 rc2 or not.

*         The "random" autobuilder failures continue to cause problems. We're looking into the issues and there should be bugs being filed under the "master bug" https://bugzilla.yoctoproject.org/show_bug.cgi?id=7983

*         Tinfoil2 (the new version of tinfoil that works with memory resident bitbake) is progressing but as we try and do new things with the bitbake APIs, we're exposing issues we need to fix before we can make it work.

*         The knock on effect of the issues we're having is that some of the features we're considering may not make 1.9.


Key YP 1.9 Dates:

YP Final/M4 Cut off: Sept. 28, 2015 noon GMT

1.9 M2 Release Target: Before Aug. 14, 2015

1.9 M3 Release Target: Before Sept. 11 2015

1.9 final Release Target: Before Oct. 30, 2015


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v1.9_Status

https://wiki.yoctoproject.org/wiki/Yocto_1.9_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_1.9_Features


Tracking Metrics:

            WDD 1835 (last week 1758 )

(https://wiki.yoctoproject.org/charts/combo.html)


[If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
*   Work Telephone:          (503) 712-0534
*    Cell:                                (208) 244-4460
* Email:                             stephen.k.jolley at intel.com

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20150807/77cf49ac/attachment-0002.html>


More information about the Openembedded-core mailing list