[OE-core] Yocto Project Status WW50'19

sjolley.yp.pm at gmail.com sjolley.yp.pm at gmail.com
Tue Dec 10 15:40:16 UTC 2019


Current Dev Position: YP 3.1 M1 

Next Deadline: YP 3.1 M1 build Dec. 2, 2019

 

Next Team Meetings:

*	Bug Triage meeting Thursday Dec. 12th at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
*	Monthly Project Meeting Tuesday Jan. 7th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Twitch - Next event is Tuesday Dec. 17th at 8am PDT (
<https://www.twitch.tv/yocto_project> https://www.twitch.tv/yocto_project)

 

Key Status/Updates:

*	YP 3.0.1 was released.
*	Python 2.x has been removed from HOSTTOOLS so OE-Core is python2 use
free.
*	Hash Equivalency has been enabled by default for poky using a local
server.
*	YP 3.1 M1 was due to be built but issues have been encountered in
the release builds, both with previously unseen hash equivalence issue and a
ptest performance regression on the autobuilders. Both issues are being
worked on but are further delaying a successful M1 build.
*	Intermittent build failures continue to hamper builds, particularly
combined with the above issues and as few people are available to attempt to
debug and resolve them.
*	Patch review and testing has run into new issues with a number of
regressions from upgrades causing instability. Most of these were isolated
pre-merge but not all.
*	The TSC is working on LTS plans, productive discussions have been
had and a new policy on handling this and stable releases should be
available in the coming weeks.
*	We are continuing to collect ideas for YP 3.1 in this document:
<https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yj
nABc/edit?usp=sharing>
https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjn
ABc/edit?usp=sharing
*	If anyone has any status items for the project they'd like to add to
the weekly reports, please email Richard and Stephen.

 

YP 3.1 Milestone Dates:

*	YP 3.1 M1 build date 12/2/2019
*	YP 3.1 M1 release date 12/13/2019
*	YP 3.1 M2 build date 1/20/2020
*	YP 3.1 M2 release date 1/31/2020
*	YP 3.1 M3 build date 2/24/2020
*	YP 3.1 M3 release date 3/6/2020
*	YP 3.1 M4 build date  3/30/2020
*	YP 3.1 M4 release date  4/24/2020

 

Planned upcoming dot releases:

*	YP 3.0.1 is released.
*	YP 2.7.3 build date  2/10/20
*	YP 2.7.3 release date 2/21/20
*	YP 3.0.2 build date  2/3/20
*	YP 3.0.2 release date 2/14/20

 

Tracking Metrics:

*	WDD 2698 (last week 2620) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*	Poky Patch Metrics  

*	Total patches found: 1410 (last week 1444)
*	Patches in the Pending State: 564 (40%) [last week 571 (40%)]

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Project Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp.pm at gmail.com
<mailto:sjolley.yp.pm at gmail.com> 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20191210/32fe425b/attachment-0001.html>


More information about the Openembedded-core mailing list