Current Dev Position: YP 3.1 M2

Next Deadline: YP 3.1 M2 build date 1/20/2020

 

Next Team Meetings:

*	Bug Triage meeting Thursday Dec. 19th at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
*	Monthly Project Meeting Tuesday Jan. 7th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Weekly Engineering Sync Tuesday Dec. 12th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Twitch - Next event is Tuesday Dec. 17th at 8am PDT (
<https://www.twitch.tv/yocto_project> https://www.twitch.tv/yocto_project)

 

Key Status/Updates:

*	YP 3.0.1 was released.
*	YP 3.1 M1 rc8 is in QA
*	YP 3.1 M1 took a record number of build attempts due to various
issues which only appeared during the rc builds.
*	Despite a successful rc8 build (which still had reproducible build
test failures) there are a number of concerns, particularly as there appears
to be very slow builds for some 'pathological' hashequiv scenarios. There
has been some progress over the weekend on identifying the causes of that
and partially addressing them.
*	There remains a growing set of intermittent autobuilder failures
which occur with varying frequencies. We're struggling to find anyone with
time/interest to resolve these and they are becoming problematic for
reviewing/testing patches and  triaging builds.
*	The TSC is working on LTS plans, productive discussions have been
had and a new policy on handling this and stable releases should be
available in the coming weeks.
*	We are continuing to collect ideas for YP 3.1 in this document:
<https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yj
nABc/edit?usp=sharing>
https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjn
ABc/edit?usp=sharing
*	Due to holidays in EU/US, the next status report will be sent in
early January (likely 7th). If there is anything critical to report this
will happen as needed.

 

YP 3.1 Milestone Dates:

*	YP 3.1 M1 is in QA
*	YP 3.1 M1 release date 12/13/2019
*	YP 3.1 M2 build date 1/20/2020
*	YP 3.1 M2 release date 1/31/2020
*	YP 3.1 M3 build date 2/24/2020
*	YP 3.1 M3 release date 3/6/2020
*	YP 3.1 M4 build date  3/30/2020
*	YP 3.1 M4 release date  4/24/2020

 

Planned upcoming dot releases:

*	YP 2.7.3 build date  2/10/20
*	YP 2.7.3 release date 2/21/20
*	YP 3.0.2 build date  2/3/20
*	YP 3.0.2 release date 2/14/20

 

Tracking Metrics:

*	WDD 2718 (last week 2698) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*	Poky Patch Metrics  

*	Total patches found: 1410 (last week 1410)
*	Patches in the Pending State: 564 (40%) [last week 564 (40%)]

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Project Manager

*    Cell:                (208) 244-4460

* Email:               <mailto:sjolley.yp.pm at gmail.com>
sjolley.yp.pm at gmail.com

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20191217/48d19d49/attachment-0001.html>


More information about the Openembedded-core mailing list