Current Dev Position: YP 2.7 M3 (New feature Freeze has begun.)
Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019
SWAT Team Rotation:
* SWAT lead is currently: Ross
* SWAT team rotation: Ross -> Chen on Mar. 1, 2019
* SWAT team rotation: Chen -> Armin on Mar. 8, 2019
* <https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team>
https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Key Status/Updates:
* We have now passed the feature freeze point for 2.7
* YP 2.7 M2 rc2 is out of QA and being readied for release. See:
<https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_
M2_RC2>
https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_M
2_RC2 and
<https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_
Target_Feb._1.2C_2019>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_T
arget_Feb._1.2C_2019
* We now have resulttool, buildhistory and build-performance all
working with the autobuilder and will be using this as the primary QA
mechanism going forward. More details can be found here:
<http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febr
uary/001591.html>
http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febru
ary/001591.html
* There were some serious usability issues found with multiconfig,
those have been fixed in master and thud.
* Various recipe upgrades made it in, thanks to all who contributed.
Several recipes also converted to meson including glib-2.0 and gdk-pixbuf.
* We now need to build M3 as we're past feature freeze point for 2.7.
Right now we're aware of the following things which ideally need to be
resolved first:
* Bug 13178 "X server and matchbox desktop don't start up properly on
beaglebone" needs to be fixed
* Find the framebuffer problem with qemuarmv7 and switch to that
* Several ptest issues would be addressed (missing openssl tests, 3
timeouts)
* Arm build host issues identified and resolved
* It's unlikely we'll switch to virtgl by default for 2.7 due to lack
of testing from the community although the base patches for this have
merged.
Planned Releases for YP 2.7:
* YP 2.7 M2 rc2 is out of QA.
* YP 2.7 M2 Release Target was Feb. 1, 2019
* YP 2.7 M3 Cutoff is Feb. 25, 2019
* YP 2.7 M3 Release Target is Mar. 8, 2019
* YP 2.7 M4 Cutoff is Apr. 1, 2019
* YP 2.7 M4 Release Target is Apr. 26, 2019
Planned upcoming dot releases:
* YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
* YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
* YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
Tracking Metrics:
* WDD 2415 (last week 2392) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
* Poky Patch Metrics
* Total patches found: 1516 (last week 1527)
* Patches in the Pending State: 660 (44%) [last week 663 (43%)]
Key Status Links for YP:
<https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
<https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
<https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features
The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]
Thanks,
Stephen K. Jolley
Yocto Project Program Manager
* Cell: (208) 244-4460
* Email: sjolley.yp.pm at gmail.com
<mailto:sjolley.yp.pm at gmail.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20190226/531ddbe2/attachment-0001.html>
More information about the Openembedded-core
mailing list