[OE-core] Yocto Project Status WW41’19
Stephen K Jolley
sjolley.yp.pm at gmail.com
Tue Oct 8 14:51:28 UTC 2019
Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct
SWAT Team Rotation:
-
SWAT lead is currently: Chen
-
SWAT team rotation: Chen -> Paul on Oct. 11, 2019
-
SWAT team rotation: Paul -> Ross on Oct. 18, 2019
-
https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
-
Bug Triage meeting Thursday Oct. 10th at 7:30am PDT (
https://zoom.us/j/454367603)
-
Monthly Project Meeting Tuesday Oct. 8th at 8am PDT (
https://zoom.us/j/990892712) <https://zoom.us/j/990892712>
-
Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (
https://zoom.us/j/990892712) <https://zoom.us/j/990892712>
-
Twitch - Next event is Tuesday Oct. 8th at 8am PDT (
https://www.twitch.tv/yocto_project)
Key Status/Updates:
-
The project is about to build M4 rc1 once some final tweaks have been
tested and merged (details below).
-
Known issues that have been or are to be addressed before M4 rc1 is
built:
-
Strace kernel timeout problems - the issue has now been reproduced
and understood upstream and a patch has been found to address
the issue. We
therefore plan to include this in M4 rc1 (thanks Bruce)
-
We upgraded to a new uninative version to ensure compatibility with
distros shipping glibc 2.30 (thanks Michael/Armin).
-
We resolved the systemd hwdb postinst script issues (thanks Ross)
-
The eSDK performance issue has been worked around but removal of old
sstate artefacts on the system however we ultimately do need to improve the
code (will target 3.1).
-
If anyone has any status items for the project they’d like to add to the
weekly reports, please email Richard+Stephen.
Planned Releases for YP 3.0 {2.8}:
-
M4 Cutoff 30th Sept - this will be YP 3.0.
-
YP 3.0 {2.8 (M4)} Final Release 25th Oct
Planned upcoming dot releases:
-
YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
-
YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.
Tracking Metrics:
-
WDD 2525 (last week 2552) (
https://wiki.yoctoproject.org/charts/combo.html)
-
Poky Patch Metrics
-
Total patches found: 1448 (last week 1440)
-
Patches in the Pending State: 587 (41%) [last week 587 (41%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features
The Yocto Project’s technical governance is through its Technical Steering
Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC
The Status reports are now stored on the wiki at:
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you’d like to see on this
weekly status update, let us know!]
--
Thanks,
*Stephen K. Jolley*
*Yocto Project Program Manager*
*7867 SW Bayberry Dr., Beaverton, OR 97007*
( *Cell*: (208) 244-4460
* *Email*: *s
<stephen.k.jolley at intel.com>jolley.yp.pm at gmail.com <jolley.yp.pm at gmail.com>*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20191008/2cc4e7bb/attachment-0001.html>
More information about the Openembedded-core
mailing list