[OE-core] Yocto Project Status WW43’19
Stephen K Jolley
sjolley.yp.pm at gmail.com
Tue Oct 22 14:55:58 UTC 2019
Current Dev Position: YP 3.1 M1
Next Deadline: YP 3.0 Final Release 25th Oct
SWAT Team Rotation:
-
SWAT lead is currently: Paul
-
SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
-
SWAT team rotation: Amanda -> Armin on Nov. 1, 2019
-
https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
-
Bug Triage meeting Thursday Oct. 24th at 7:30am PDT (
https://zoom.us/j/454367603)
-
Monthly Project Meeting Tuesday Nov. 5th at 8am PDT (
https://zoom.us/j/990892712) <https://zoom.us/j/990892712>
-
Weekly Engineering Sync Tuesday Oct. 22th at 8am PDT (
https://zoom.us/j/990892712) <https://zoom.us/j/990892712>
-
Twitch - Next event is Tuesday Nov. 12th at 8am PDT (
https://www.twitch.tv/yocto_project)
Key Status/Updates:
-
YP 3.0 as been approved by the TSC and should be released later this
week. Only the final tweaks to the release notes remain.
-
Master has continued taking patches for post 3.0.
-
There are a number of intermittent failures on the autobuiler which are
causing concern, there is a separate email about this.
-
YP 2.6.4 was built and submitted to QA
-
YP 2.7.2 was not built due to a remaining bug which needs to be resolved
first
-
Next week is ELC-E and therefore may be quiet on the mailing lists with
patch merging being delayed.
-
We have begun collecting ideas for YP 3.1 in this document:
https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
-
If anyone has any status items for the project they’d like to add to the
weekly reports, please email Richard+Stephen.
Planned Releases for YP 3.0:
-
YP 3.0 Final Release 25th Oct
Planned upcoming dot releases:
-
YP 2.7.2 (Warrior) is planned this week (assuming the remaining bug is
resolved).
-
YP 2.6.4 (Thud) is in QA..
Tracking Metrics:
-
WDD 2498 (last week 2528) (
https://wiki.yoctoproject.org/charts/combo.html)
-
Poky Patch Metrics
-
Total patches found: 1432 (last week 1445)
-
Patches in the Pending State: 578 (41%) [last week 586 (41%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features
The Yocto Project’s technical governance is through its Technical Steering
Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC
The Status reports are now stored on the wiki at:
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you’d like to see on this
weekly status update, let us know!]
Thanks,
*Stephen K. Jolley*
*Yocto Project Program Manager*
*7867 SW Bayberry Dr., Beaverton, OR 97007*
( *Cell*: (208) 244-4460
* *Email*: *s
<stephen.k.jolley at intel.com>jolley.yp.pm at gmail.com <jolley.yp.pm at gmail.com>*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20191022/4d35df1b/attachment-0001.html>
More information about the Openembedded-core
mailing list