[OE-core] Yocto Project Status WW22’18

Jolley, Stephen K stephen.k.jolley at intel.com
Tue May 29 14:59:08 UTC 2018


Current Dev Position: YP 2.6 M1 is accepting patches.

Next Deadline: YP 2.6 M1 release is June 11, 2018


SWAT Team Rotation:

·         SWAT lead is currently: Paul

·         SWAT team rotation: Paul -> Tracy on June 1, 2018

·         SWAT team rotation: Tracy -> Amanda on June 8, 2018

·         https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

·         2.4.3 is in QA

·         2.3.4 and 2.2.4 are also both queued ready for QA after 2.4.3.

·         Khem has been doing great work in heading off gcc 8.x issues and several patches have merged in this area

·         We continue to struggle to get green builds for patch merging, there are a lot of patches being posted and we’re doing the best we can to get these tested, the good ones merged and feedback given on the problematic ones.

·         We could do with getting a feel for who is using/interested in mips/powerpc support and which areas of those architectures they may be using. We could do with rationalizing the test matrix and those are some of the slowest emulated platforms we have, there are also questions about how long support will be maintained in glibc/gcc.


Planned Releases for YP 2.6:

·         YP 2.6 M1 Build Target is June 11, 2018

·         YP 2.6 M1 Release Target is June 22, 2018

·         YP 2.6 M2 Build Target is July 16, 2018

·         YP 2.6 M2 Release Target is July 27, 2018

·         YP 2.6 M3 Build Target is Aug. 27, 2018

·         YP 2.6 M3 Release Target is Sept. 7, 2018

·         YP 2.6 M4 Build Target is Oct. 1, 2018

·         YP 2.6 M4 Release Target is Oct. 26, 2018


Planned upcoming dot releases:

·         YP 2.4.3 (Rocko) rc2 is built and in QA see https://wiki.yoctoproject.org/wiki/2.4_QA_Status it is 62% complete.

·         YP 2.3.4 (Pyro) rc1 is built and in QA see https://wiki.yoctoproject.org/wiki/2.3_QA_Status it is at 7% complete.

·         YP 2.2.4 (Morty) rc1 is built and in QA see https://wiki.yoctoproject.org/wiki/2.2_QA_Status it hasn’t started yet.


Tracking Metrics:

·         WDD 2508 (last week 2510) (https://wiki.yoctoproject.org/charts/combo.html)

·         Patches

o    Total patches found: 1601 (last week 1599)

o    Percentage of patches in the Pending State: 47% (last week 47%)


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.6_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.6_Features


The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status


[If anyone has suggestions for other information you’d like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Project Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
•    Cell:                (208) 244-4460
• Email:                             stephen.k.jolley at intel.com

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20180529/428506d5/attachment-0002.html>


More information about the Openembedded-core mailing list